Water production plant Lac à la Pêche in Shawinigan

ABF supplied and installed over 1000 tons of reinforcing steel on this project.

Type of project

Civil engineering

Year of construction

2017

Reinforcing steel required

+/- 1 000 tons

Location

Shawinigan

Similar projects